Join Now or Sign-in

OR SIGN-IN HERE

 Save Our Space Program

 Connect With Us

 STS-130 Shuttle Mission Archive

STS-132/ULF-4 space shuttle Atlantis mission coverage archive, including articles, images, video and documents.

 Daily Space Update

 Topics
Home
STS-132 Atlantis
STS-131 Discovery
ISS Expedition 22
STS-130 Endeavour
STS-129 Atlantis
Ares I-X Test Flight
General Space News
Shuttle/ISS
NASA News
Vision For Space Exploration
Constellation & Ares/Orion
Launches and Missions
Mars Exploration
Mars Exploration
STS-122 Atlantis
STS-123 Endeavour
STS-124 Discovery
STS-125 Atlantis
STS-128 Discovery
STS-126 Endeavour
STS-119 Discovery
STS-127 Endeavour
ISS Expedition 18
ISS Expedition 19
Space Business
Space History
STS-107 Disaster
Press Releases
Status Reports
Commentary
Website News
Space Generation
X-Prize
Cheap Access 2 Space
Amateur Rocketry
Smallsat News
Rocket Science
Advocacy News

 Advertisement

 Other Sections
Featured Areas
Movies
Space Downloads
Space Forums
USAF Cape Canaveral History
Spaceline Cape Canaveral history
Image Galleries
SEDS Image Galleries
AMSAT FTP Archive
rec.models.rockets Archive
Online Rocket Calc. Scripts
NASA SP-8000 Space Design Criteria
Search The Web
Printable
About The Spacearium
Terms of Service
Privacy
Advertise With Us

 Menu
Home
Username:

Password:

Don't have an account yet? Sign up as a New User


Inside Spaceflight :: Featured Videos :: Forum
Volume 7; Issue 209       Spaceflight News       ISSN 1939-8522

 
  Ares I Rocket Test Flight Facing Five Week Delay    

Ares launch vehicle KENNEDY SPACE CENTER, FL - The first test flight of NASA's new ARES I launch vehicle faces a five-week slip, constellation program officals said today. Delays in the production of new external tanks for the space shuttle will likely force a delay in the upcoming Hubble Space Telescope servicing mission and cause a domino effect on preparations for the Ares I-X flight currently targeted for next April.

VIDEO: MAY 15 ARES I-X STATUS TELECONFERENCE



News of the potential schedule slip came Monday during a teleconference with project managers in NASA's Project constellation office.

The Ares I-X test flight is currently targeted to blastoff from Kennedy Space Center's Launch complex 39-B around April 15, 2009. The launch pad hasn't been used since Discovery's STS-116 launch in December, 2006.

No more space shuttle launches are scheduled to take place from the pad, but it can't be modified to accommodate the Ares I-X flight until after space shuttle Atlantis mission to service Hubble later this year.

Before the launch pad can be handed over to Constellation, the shuttle program will require its availability to mount a mission to rescue the crew of Atlantis should that orbiter become disabled or experience serious damage that would prevent a safe re-entry.

Because HST flies in a 28.5 degree inclination orbit compared to the space station 51.6 degree flight path, the astronauts won't have the option to fly from Hubble to the space station and await a rescue mission from its relative safety.

Instead, NASA has put in place the requirement to have space shuttle Endeavour processed alongside Atlantis and to have both shuttle's on the launch pad for STs-125. Endeavour would then be ready to mount a quick-reaction rescue mission if necessary.

The requirement for the pad to be available for the Hubble mission means that Constellation won't be able to take it over and make the major modifications necessary to support Ares I-X until after Atlantis returns to Earth.

Likewise, modifications to the assembly bay in the Vehicle Assembly building that the Ares rocket requires have to wait until after the shuttle program no longer needs it.

As a result, any significant delay in getting Atlantis off the ground could result in a comparable delay in the launch of Ares I-X.

Unfortunately, STS-125 is facing a likely five-week delay, from late August to early October, due to external tank processing difficulties.

Jeff Hanley, NASa's Project Constellation Project Manager, said that, as of now, it appears the impact of the shuttle processing delays "suggest a day-for-day slip."

Following the Columbia accident, the shuttle's external tanks have undergone extensive modifications and redesign. Up until now, all the tanks that have flown post-Columbia have been tanks that were already assembled or partly built before the STS-107 accident.

Those tanks were subsequently retrofitted with the design changes ordered to mitigate the occurrence of foam, ice and other debris shedding during launch.

Beginning with STS-124, the tanks being delivered to Kennedy Space Center are "clean". That is, they were assembled from the ground up with the modifications in place. Due to different procedures that are now in place, and additional inspections and testing, it's taking longer to assemble the tanks than in the past.

The net result of all this is that tanks are getting to KSC later than originally anticipated, and hence the next several shuttle launch dates face delays of several days to weeks.

Next week, NASA managers will likely push back Atlantis launch from August 28 to October 8. This will have a ripple-effect and push back Ares 1-X by a similar amount.

Some processing work on the pad and mobile launch platform can be done concurrent with preparing Endeavour for a rescue mission, but the major work will have to wait until Endeavour is moved over to Pad A for its STS-126 mission to the space station early next year.

This means that the first Ares test flight faces, in a worst-case scenario, a day-for-day slip matching Atlantis' launch delay, although it's possible several days can be made up by then.

"We're doing what we can to look at what could be done to do parallel work or other ideas that might be in play to get the modification work to the Mobile Launch Platform done and still mitigate some of that impact to the (Ares) I-X launch date," Hanley said.

Nonetheless, the launch date for Ares I-X will slip from mid-April until late May 2009.

Among the modifications that Pad B will undergo include extending the Fixed Service Structure by about 100 feet and the addition of a new, taller lightning mast to protect the Ares rocket while it's sitting on the pad. The new mast is necessary given that the 309 foot tall Ares I launch vehicle is over 100 feet taller than the space shuttle and is, in fact, taller than the top of the current lightning mast.

Other modifications include outfitting a shuttle mobile launch platform with necessary umbilicals and connections to support the Ares I-X launch configuration.

Constellation program officials downplayed the significance of the Ares I-X slippage, pointing out that the driving factor is getting the data from the test flight in time to do a thorough analysis before the Ares I critical design review in March 2010.

Engineers need the raw data at least six-months befoe the design review in order to give sufficient time to analyze the results and make any modifications to the Ares I baseline design that might be required before the new launch vehicle will pass the review.

Even with a five-week slip, the Ares I-X test flight still has a several month margin in which to launch the test flight before additional delays impact the March CDR.

Ares I???X is planned to be the first test flight of the Ares I vehicle. The test flight objectives are focused on first-stage flight dynamics, controllability, and separation of the first and upper stages. The Ares I???X flight will consist of a four-segment shuttle solid rocket booster with a dummy fifth segment first stage and an upper stage mass simulator, which has the same mass as the actual upper stage. The test flight will also verify the performance and dynamics of the shuttle???s solid rocket booster in ???single stick??? arrangement as opposed to the two-booster configuration of the space shuttle.

(The Spacearium / SpaceflightNews.net)

 Get exclusive space-related downloads, mission coverage and information
Full page view    




 What's Related
  • More from Constellation & Ares/Orion


  • Ares I Rocket Test Flight Facing Five Week Delay | 0 comments | Create New Account
    The following comments are owned by whomever posted them. This site is not responsible for what they say.
    No user comments.


    Featured YouTube Videos

    Visit our YouTube Channel


     
     Next Launch
    It appears that there are no stories on this site or no one has ever viewed them.

     Stay Up To Date
    Get all the lates headlines on The Spacearium. Always have the latest RSS Feed delivered to you. Download the SpaceflightNews.net Google Gadget to your Google Desktop now.

    Click here to install
    Get the latest space news on your mobile phone! Click here for more information.

     Featured All-Access Video
    The Mission Of Apollo-Soyuz
    THE MISSION OF APOLLO-SOYUZ

    On July 15, 1975, the United States and Soviet Union superpowers set aside their Cold War differences and came together for history-making cooperation in space - the Apollo-Soyuz Test Project.

    Watch Other Videos

     Watch NASA TV

    Watch in RealMedia
    Listen in RealMedia
    Watch in Windows Media
    NASA TV Schedule


     KSC/CCAFS Video

    Click for All Video Feeds

     Spacetoday
  • USA issues layoff notices to shuttle workers
  • Court approves Sea Launch reorganization plan
  • Russian cosmonauts perform ISS spacewalk
  • Curiosity rover takes first drive
  • House committee approves NASA authorization bill

  •  Vote

    What should NASA use for human space transportation after the shuttle is retired?

    Ares I/V and Orion
    EELV and Orion
    Other commercial vehicle
    Results
    29 votes

     Event Calendar
    July 2010
    SuMoTuWeThFrSa
    27
    28
    29
    30
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27
    28
    29
    30
    31
    Click on any day to see postings and events for that date.

     SpaceRef Space Wire
  • NASA ISS On-Orbit Status 29 July 2010
  • Joint USAF/NOAA Report of Solar and Geophysical Activity 29 July 2010
  • Your Help Urgently Needed to Save the Future of Human Spaceflight
  • Spirit Remains Silent at Troy
  • Opportunity in Good Health and Continues to Drive, Despite Lack of Downlink
  • Martian Dust Devil Whirls Into Opportunity's View
  • Wyle Scientist to Study Stress in Haughton-Mars Project Spaceflight Analog
  • GRAIL Spacecraft Takes Shape
  • Brown Dwarf Found Orbiting a Young Sun-Like Star
  • NASA ISS On-Orbit Status 28 July 2010
  • NOAA SATOPS Morning Report: Thursday, July 29, 2010
  • IceCube spies unexplained pattern of cosmic rays
  • NASA Selects Sounding Rockets Operations Contractor
  • Joint USAF/NOAA Report of Solar and Geophysical Activity 28 July 2010
  • NASA ISS On-Orbit Status 27 July 2010
  • NASA GSFC Solicitation: Consultation and Support Services for Public Outreach Contest
  • NASA Student Ambassadors Virtual Community and On-line Application Launchpad Site
  • Curiosity Rover Grows by Leaps and Bounds
  • Brilliant Star in a Colorful Neighborhood
  • NASA Sets Briefing To Preview Space Station Spacewalk


  •  Copyright © 2010 The Spacearium, All Rights Reserved.
     All trademarks and copyrights on this page are owned by their respective owners.
     Space Media Corporation is a wholly owned company of the Aerospace Research & Engineering Systems Institute, Inc.
    Powered By PHP MYSQL And Apache
    Created this page in 0.52 seconds 
    Google